The problem
Goal: Structure any request to get a fast yes.
The structure is three beats. The problem, in one sentence, with a number if you have one. The solution, in one sentence. The ask, specific, with a date.
Weak versus strong
So there’s been a lot going on with the support queue lately, and the team’s been stretched, and I was wondering if we could maybe talk about options at some point.
Support response times have doubled to two days. A second shift would bring them under four hours. I need approval for two hires this month.
Why it works. The strong version can be approved in the corridor. The weak version needs a meeting to understand it.
The shift
No background story. Context comes after, only if they ask for it.
The technique in three steps
Problem. Solution. Ask.
- 1Problem. One sentence, with a number.
- 2Solution. One sentence.
- 3Ask. Specific, with a date.
Try it out loud
Situation
Your team’s tools are slow and you want budget for new ones.
Say your answer out loud before you open the model answer. Speaking is the training.
Show one strong answer
Our build takes forty minutes. New tooling would cut it to ten. I need eight thousand approved this quarter.
The full lesson has four more situations, a speed round and a practice studio that scores your answer.
Apply it today
Think of something you need approved. Say it now in problem, solution, ask.
Then use it in one real conversation before the day ends.
Common questions
How do I ask my boss for budget?
Problem in one sentence with a number, solution in one sentence, then the specific ask: “Slow tools cost us ten hours a week. A new system fixes it. I need $4,000 approved this month.”